国产高清一区二区三区-国产成人性色生活片-亚洲精品久久激情国产片-五月综合色婷婷-亚洲天堂视频在线观看-欧亚乱熟女一区二区在线-超碰c-国产精品资源-色综合久久久久综合一本到桃花网-亚洲黄色中文字幕-国产亚洲精品久久网站-国产欧美日韩亚洲一区二区三区-97超级碰碰人妻中文字幕-风流少妇又紧又爽又丰满-草草夜色精品国产噜噜竹菊

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

No.07 SD20 Rotary Drill construct in XiLong Jobsite

2009-07-07

Recently, in XiLong hydro junction jobsite, Hubei province, one unit SD20 which had worked for 6000 hours has set the new record in foundation piles.

 

XiLong hydro junction started in Feb, 2009 is the major national project, which is located in HuBei province. One of important projects is to establish a bridge on old riverbed. It is difficult with high pile requirements. The pile should be 1.5m Dia and 55m Dep. The situation of the old riverbed is complicated, and alternative allocated with clay, fine sand, and locked clay from 0-30m, below 30m, there is big and hard cobble layer.


When SD20 applied to the project, it finish a 55m depth and 1.5 dia pile with 8 hours, high efficiency and precision is praised by the projects owner. This SD20 had worked more than 6000 hours since may, 2006. The excellent performance has greatly proved the quality of our machines.

Now, this project is under way, SD20 and SG40A, SG40E worked there day and night to contribute to the national infrastructure projects.